$36M ninth-grade campus underway in Laredo | $36M ninth-grade campus underway in Laredo | https://www.recenter.tamu.edu/news/newstalk-texas/?Item=14960 | 2016-10-27T05:00:00Z | 2016-10-27T20:30:00Z | LAREDO - United ISD broke ground for the construction of the Alexander High School ninth-grade campus. The campus is located at 4601 Victory Drive, and construction is set to be complete by 2018. The $36 million project was made possible through funds allocated from a 2013 bond program. Located east of Bob Bullock Loop and Del Mar Blvd., the campus is a standalone two-story building with a detached FFA building totaling over 201,000 sf. The campus is projected for completion for the 2018–19 school year to support an enrollment of 1,200 students. Security for the campus will start at the perimeter with a guardhouse, followed by a secure foyer, where visitors are cleared before entering the building. Listen to PODCAST 321 for this story. | Laredo Morning Times
| Laredo
| Education
| http://www.lmtonline.com/front-news/article_c17495e6-962e-11e6-8ca9-c3708630e7ae.html | | | | Read more at the {Source} |