Skip Navigation
Apr 22, 2016

Hilton Austin fall look—totally wearing $23M facelift

​​​​​AUSTIN - ​A $23 million transformation initiative is planned for the Hilton Austin hotel, 500 E. 4th St.The downtown hotel is refocusing its attention to create a destination that reflects Austin’s distinctive culture.The...
Fallback Image
by
Austin Culture Map

​​​​​AUSTIN - ​A $23 million transformation initiative is planned for the Hilton Austin hotel, 500 E. 4th St.

The downtown hotel is refocusing its attention to create a destination that reflects Austin’s distinctive culture.

The lobby is the first space slated for renovation. Plans include small, intimate social zones; designated work spaces; and a digital media wall to be completed midsummer.

The hotel’s first new restaurant concept, Cannon + Belle, is set to open late summer and will feature an open kitchen.

The Austin Taco Project is the second hotel restaurant, which will open late fall. 

The taco joint will be the more laid back of the two restaurant concepts.

The Reverbery will open late summer and will serve as Hilton Austin’s new banquet hall with an “Austin-cool studio vibe” and flexible indoor/outdoor space. 

A new 80,000-sf meeting space will follow in early fall. 

A new 3,000-sf Starbucks will also go in on Hilton’s ground floor.

Spearheaded by EDG Interior Architecture + Design, Hilton Austin’s $23 million makeover will begin in May and is expected to wrap by the end of 2016. 

Fallback Image
Written by
Austin Culture Map
Last updated
Mar 28, 2024

In This Article

You might also like

TG Magazine
PUBLISHED SINCE 1977

TG Magazine

Check out the latest issue of our flagship publication.

SUBSCRIBE TO OUR

Publications

Receive our economic and housing reports and newsletters for free.